ONGOING PROJECTS:

GAS PIPELINE PROJECTS:

Sl.No. Name of the Project Project Owner Dipon’s Part of the  Project Execution period Present Status of the Project
1.

“Procurement and Supply of all Materials (Line pipes, Coatings & Wrapping, Induction Bends, Miscellaneous fittings, Valves, Pig Traps etc.), and Construction of 20-inch 1000 psig 10 KM High Pressure Gas Transmission Pipeline from Bibiyana Gas Field End to Bibiyana Power Station-3 at Parkul, Nobiganj and Hook Up on Turnkey Basis”

Bangladesh Power Development Board

Gas Transmission Pipeline & Fabrication Works on EPC Basis

2013-2014

ongoing

 

WATER PIPELINE PROJECTS:

Sl.No. Name of the Project Project Owner Dipon’s Part of the  Project Execution period Present Status of the Project
1.

Well Field Construction Project at Tetulzhora-Bhakurta Area of Savar Upazilla

Dhaka Water Supply & Sewerage Authority

Pipeline works (Section-1): 7.00 Km of water pipeline of Ø1100mm pipe of 2300m, Ø1000mm pipe of 1600m, Ø800mm pipe of 1550m, and Ø600mm pipe of 1550m with associated chamber works.

2016-2017

Pipeline Construction Completed and other installation will be completed by December, 2017

2.

Well Field Construction Project at Tetulzhora-Bhakurta Area of Savar Upazilla

Dhaka Water Supply & Sewerage Authority

Pipeline works (Section 4-c): 1200m of water pipeline of Ø1100mm pipe and associated chamber works.

2016-2017

Pipeline Construction Completed and other installation will be completed by December, 2017

3.

Well Field Construction Project at Tetulzhora-Bhakurta Area of Savar Upazilla

Dhaka Water Supply & Sewerage Authority

Pipeline works (Section 4-b): Total 4000m of Water Pipeline of Ø1200mm pipe. This project comprises of 40m Pipe Jacking Work under, 140m Pipeline of River Crossing through Cofferdam Work.

2016-2017

Pipeline Construction Completed and other installation will be completed by December, 2017

 

CIVIL ENGINEERING PROJECTS:

Sl.No. Name of the Project Project Owner Dipon’s Part of the  Project Execution period Present Status of the Project
1.

Main Terminal & Bottling Plant at Mongla

Omera LPG Bottling Plant

LPG Import Terminal and Bottling Plants Construction Projects in Bangladesh

2012-2014

ongoing

2.

Omera LPG Bottling Plant at Dhaka, Chittagong & Bogra

Omera LPG Bottling Plant

LPG Import Terminal and Bottling Plants Construction Projects in Bangladesh

2012-2014

ongoing

 

POWER PLANT PROJECT:

Sl.No. Name of the Project Project Owner Dipon’s Part of the  Project Execution period Present Status of the Project
1.

17 MW Power Plant, Chittagong

S. Alam Power Generation Ltd.

Installation of Power Plant

2012-2014

ongoing

2. 100 MW Power Plant, Jamalpur PowerPac-Mutiara Jamalpur Power Plant Ltd. Installation of Power Plant 2014-2015 ongoing
3. 100 MW Power Plant, Khulna PowerPac-Mutiara Khulna Power Plant Ltd.  Installation of Power Plant 2015-2016 Will commence soon

 

DIPON CONSULTANCY SERVICES LTD. (DCSL):

Sl.No. Name of the Project Project Owner Dipon’s Part of the  Project Execution period Present Status of the Project
1.

Fisherman ID Card project

Department of fisheries

Photo capture, Data entry and personalization, Software development & implementation for fisherman ID issuance process

2013-2014

ongoing

2.

Prime cash project

Prime bank & Dipon Consultancy services Ltd.(DCSL)

Agent Network, Transection system provider & Maintenance,  Software development & implementation

2011 to till now

ongoing